Items that have been started but not yet finished. Having more of them makes lead and cycle times longer, so boards let you set WIP limits.
Also called WIP.
Read more: Microsoft Learn
In the Ultra Transcenders books
Each book explains Work in progress in context, with comparison tables and the common traps.
Terms in this definition
- HAVING
Applies a condition to groups produced by GROUP BY, often on an aggregate such as SUM(). WHERE works earlier, on individual rows before they are grouped.
- LEAD
Lets a query read a value from a later row of its own results, avoiding the need to join the table to itself.
- Set
Secret permission in Key Vault for writing secrets; some older material refers to it as Create.
- WIP
A retired Windows technology for protecting data. You can no longer create new WIP policies that work without enrolment, and Microsoft points customers to Microsoft Purview.
Related terms
- CFD
An Azure Boards chart showing how many work items sit in each state over time, revealing flow, work in progress and bottlenecks. It can't give precise lead or cycle times; separate widgets do that.
- Flow metrics
Cycle time, lead time and the amount of work in progress are examples: they show how items travel through a team's process. DORA metrics differ, judging how well software gets delivered.
- WIP limit
A soft maximum on how many items a board column should hold. Once it is exceeded, Azure Boards turns the column's count red; more work in progress means longer lead and cycle times.