Scaling out adds capacity and resilience, at the cost of two more VMs and a decision that cannot be undone. The two high availability mechanisms below do different jobs, and both can apply.

Mechanism What it does Requirements Result of a failure
VM high availability Acropolis restarts the Prism Central VM on another node pc.2024.1 or later, AOS 6.8 or later, AHV 20230302.100173 or later Prism Central restarts after a node failure
Scale-out Three VMs with a fault tolerance of one Prism Central VM See the rules below One VM lost: the other two take the load and Prism Central stays active. Two or three lost: inactive

Scale-out rules

Before starting scale-out, confirm the gateway is reachable, addresses are unique and the container is mounted on the hosts. On ESXi, vCenter must be correctly configured, registered in Prism, reachable, and have DRS enabled.

Rule Detail
Direction One way: single VM to three VMs. Reverting is not supported
Placement All three VMs on the same cluster
Not supported X-Small; non-Nutanix ESXi
Hosting cluster registration Not supported unregistered if a portfolio product such as Self-Service or Disaster Recovery is enabled
New VM size vCPU and memory are fixed to match the current VM
Network Read-only; the same network applies to the new VMs
Addresses One virtual IP for single-point access, plus an IP for each new VM
Availability Expect downtime; the web console may be inaccessible during the process
Version If upgraded to 2022.9 or later on Prism Element that is not on AOS 6.6, a pre-check blocks 1-node to 3-node scale-out

The procedure is Settings > Prism Central Management > Scale Out PC, add the virtual IP, enter the two addresses, then Expand. If a proxy is configured on the cluster, add the Prism Central and Prism Element addresses to the proxy allowlist. At a dark site, where the image cannot be reached, upload the 1-click deploy files to a CVM and run the command below, then continue.

nutanix@cvm$ ncli software upload \
  software-type=PRISM_CENTRAL_DEPLOY \
  file-path=file_path \
  meta-file-path=metadata_file_path

Three follow-up tasks apply after expansion:

Checking resources before and after changes

The Prism Central Allocation and Consumption tab, under Prism Central Management, is the single place to review the instance. It shows total vCPU and memory consumption over the last hour, 24 hours or week, vDisk capacity per VM, and how vCPU and memory were allocated originally and to each service. Check it before enabling a feature.

If VM resources are below the amounts in KB 8932, manually increase memory and vCPUs. Only supported additions belong on the VM: do not add vDisks or NICs beyond those the installation or upgrade instructions specify.

Deleting any scaled-out Prism Central VM can result in data loss, so treat them as one instance. The console also supports a maximum of 10 concurrent user sessions across UI and API combined.

Common trap: Spreading the three VMs across two clusters to survive a cluster failure - all scaled-out VMs must run on the same cluster, so scale-out protects against losing one VM, not a site. See “Protecting Prism Central” for cluster-level recovery.

Get the whole book

This note is one section of Ultra Transcenders NCP-MCI-7.5: Nutanix Multicloud Infrastructure, an independent study guide that explains every topic the exam covers by technology, with comparison tables, diagrams and the common traps, plus a glossary linked to the Nutanix Support Portal.

Amazon.co.ukKindle: coming soonPaperback: coming soon
Amazon.comKindle: coming soonPaperback: coming soon

Due on Amazon in November 2026, in Kindle and paperback editions.

About the book · NCP-MCI-7.5 terms in the glossary · All NCP-MCI-7.5 study notes

More NCP-MCI-7.5 study notes